The project started from the newly built Shanghai Baoshan Station in Shanghai, and connected to the existing Hefei South Station via Suzhou, Nantong, Taizhou, Yangzhou, Nanjing, Chuzhou and Hefei in Anhui Province.
Length of the line554.6 km, Including 519.9 kilometers of newly built railways and 34.7 kilometers of existing railways.
There are 16 stations on the whole line, including 10 newly built stations, Respectively are Shanghai Baoshan Station, Chongming Station, Qidongxi Station, Haimen North Station, Rugao West Station, Huangqiao Station, Taizhou South Station, Yizheng North Station, Nanjing North Station, and Dashu Station.
Supporting the construction of the Shanghai Baoshan and Nanjing North EMU Application Stations, the expansion of Nantong EMU Operation Station, the simultaneous implementation of related projects such as the relocation and transformation of the Nanjing Hub Normal Speed System, and the reservation of the North-East Link Project of Yangzhou East Station.
In terms of technical indicators, the positive line is double line,Design speed 350 km/h, The minimum plane curve radius is generally 7000 meters (difficult areas 5500 meters), and the maximum slope is generally 20‰ (difficult areas 25‰).
The construction period is 7 years for the section from Shanghai Baoshan Station (inclusive) to Qidongxi Station (excluding), and 5 years for the section from Qidong Station (inclusive) to Hefei South Station.
Planning the delivery capacity in the long-term year:One-way 50 million people/year.
The total investment of the project is 180.02 billion yuan, Of which the project investment is 174.08 billion yuan, and the EMU purchase cost is 5.94 billion yuan.
Project capital of 72.75 billion yuanIn part, China National Railway Group Co., Ltd. invested 8.57 billion yuan, which was solved by the use of self-raised funds by the enterprise (the investment in the central budget was determined separately); Shanghai contributed 13.77 billion yuan (including 8.26 billion yuan for land acquisition and demolition); Jiangsu Province invested 41.27 billion yuan (including 22.14 billion yuan for land acquisition and demolition costs); Anhui Province invested 9.14 billion yuan (including 3.5 billion yuan for land acquisition and demolition costs).